How to build a 90-day AI roadmap for your SME

A ninety-day roadmap is a planning example, not a delivery guarantee. It shows the next decision, who is responsible and what evidence is needed. This sequence reserves time for preparation and evaluation before deciding whether to expand the project.

Three-stage calendar path moving from discovery through a pilot to a decision point.
AI-generated editorial illustration.
In this article
  1. Days 1-20: establish the problem and conditions
  2. Days 21-40: prepare the smallest useful test
  3. Days 41-65: compare the workflow
  4. Days 66-90: decide and prepare the handover
  5. Keep dependencies beside the calendar
  6. Related reading

A roadmap that lists “select tool, build assistant, launch” hides most of the work that determines whether AI will be useful. A better ninety-day plan organizes decisions: understand one problem, prepare a bounded test, compare results and decide what deserves continued investment.

Ninety days is an illustrative planning horizon. Access approvals, data preparation and staff availability may require a different schedule. Build the plan around evidence requirements so a date never becomes an excuse to bypass unfinished work.

Days 1-20: establish the problem and conditions

The business owner selects one recurring task and records its users, current workload and consequences. The process expert gathers permitted examples, including exceptions. The technical partner checks systems, source ownership and access. Hold a short review before choosing a solution.

The output is a one-page problem brief, a baseline and a dependency list. The first review asks whether the problem is specific, inputs are usable and someone has time to review results. If those conditions are missing, change the task or extend preparation. Do not treat discovery as merely a vendor selection exercise.

Days 21-40: prepare the smallest useful test

Agree on included cases, exclusions and acceptance criteria. Prepare representative examples and expected answers. A technical lead configures only the required capabilities, while the process owner confirms the manual fallback and review responsibilities.

For a hypothetical wholesaler testing policy-answer drafts, this could mean using approved delivery policies and historical inquiries, with no access to customer pricing or order changes. The test should include an inquiry the policies cannot answer. Its expected result is a useful referral or clarification, rather than an invented commitment.

Days 41-65: compare the workflow

Run the bounded pilot with agreed reviewers. Compare task quality, full handling time, corrections and unresolved cases against the baseline. Record the time spent preparing sources and maintaining the test as well as the effort required for each task.

The second review asks whether the result is useful under ordinary conditions. If only the cleanest examples work, revise the scope before adding more users. Keep a small set of previously evaluated cases unchanged so modifications can be checked for regressions.

Days 66-90: decide and prepare the handover

The sponsor reviews an evidence memo: achieved quality, actual use, operating workload, costs and open risks. Choose a limited expansion, a specific revision with another review date, or a stop. Completion of a prototype does not oblige the business to launch it.

If expanding, assign source updates, support, access management and incident handling. Document how the team returns to its previous process if the service fails. Allocate recurring staff time; support cannot remain an undefined favor from the person who built the pilot.

Keep dependencies beside the calendar

  • Every phase has one accountable owner and a review date.
  • Every external dependency has an evidence requirement and an escalation contact.
  • Changes to scope include their effect on testing, review capacity and cost.
  • Unmet requirements move dates or narrow scope; they do not disappear from the record.

This sequence builds on the iterative design and workflow principles in OpenAI's guide and the lifecycle perspective in the NIST generative AI profile. It is a business planning aid, not a universal deployment method.